CR-DCL-014 · MODULE DEV CHECKLIST & SCOPE PLAN

Module Development Checklist & Scope Plan

Per-module build checklists and scope plan for the development agents to plan, track and verify each module to "done" before the build kicks off.

ConfidentialVersion: 1.0Status: Pre-kickoff baselineDate: 06 Jun 2026

How to Use This Document

Each module has a checklist of build items grouped by concern (data, logic, API, config, events, security, tests, observability, docs). Development agents tick items (☐ → ☑) and set status as work progresses. A module is Done only when every item is complete and its exit criteria are met. Items trace to the SRS requirements, DB schema, API spec and test suite.

All items below are seeded as Planned. This is the baseline scope; agents update status in their working copy. Statuses: Planned · In progress · Done · Blocked.

Global Definition of Done

Development Kick-off Readiness

Done?Readiness itemOwner
☐Repos created per service (see app structure); branch & CI templates in place.Cheggout Eng
☐Environments provisioned (DEV/SIT) via IaC; base images & secrets store ready.Cheggout/the Bank IT
☐Interface contracts agreed: CBS/switch feeds, channel APIs, notification gateways.the Bank IT
☐OpenAPI contract baselined; codegen wired.Cheggout Eng
☐DB schema migrations (CR-DBS-013) applied to DEV; seed/reference data loaded.Cheggout Eng
☐Synthetic test data & transaction generator available.QA
☐Security design authority review booked; SAST/secret-scan in pipeline.the Bank Sec
☐Backlog imported; stories mapped to FRs & test IDs; module owners assigned.Cheggout PM

Scope Planning Overview

Module map with dependencies, requirement & build references, target phase and status. Build in dependency order; cross-cutting items run throughout.

Per-Module Build Checklists

One checklist per module. Tick each item and update status; meet the exit criteria to mark the module Done.

Capability Coverage Checklist

Cross-module capabilities that must be explicitly built and demonstrated. Each maps to schema (CR-DBS-013) and SRS requirements.

Done?CapabilityWhat to buildModule
☐Accrual-engine typesBase, accelerated (MCC/merchant/channel), tier-multiplier & campaign-bonus earn; versioned rules; caps/exclusions/rounding.M1
☐Campaign-engine typesAll 11 campaign types (spend_threshold, milestone_ladder, first_txn, category, dormant_reactivation, festival, welcome, anniversary, birthday, surprise_delight, referral); segments; simulation & budget auto-pause.M2
☐Signature-verified redemptionSigned request (request_signature/signature_alg/signing_key_id/nonce/signed_at) verified pre-debit; single-use nonce anti-replay; signed partner fulfilment (signature_verified).M4
☐MIS / reportingreport_definition + report_run; liability, reconciliation, settlement, campaign-performance, redemption, fulfilment, expiry/reversal, budget & audit reports; scheduled/on-demand; hashed artefacts.M8
☐Logs / audit (SIEM)Immutable partitioned audit_log; api_access_log & integration_log feeds with trace/correlation ids and payload hashes; partition maintenance & archival.M8
☐Admin featuresRBAC + SSO; consoles for every config entity; maker-checker with SoD; budget & config-param versioning.M7
☐Integration readiness — communicationSMS/Email/Push/WhatsApp/In-App gateway adapters; consent & quiet-hours; delivery webhooks; calls logged in integration_log.M6
☐Integration readiness — rewardsCatalogue/voucher/gateway partner adapters; signed fulfilment requests; retry/backoff & compensation; partner responses verified & logged.M4, M12

Cross-Cutting Checklist (applies to all modules)

Done?ItemReference
☐SSO/OAuth2 + RBAC scopes enforced on every endpoint & admin action.CR-SEC-009
☐Maker-checker on all financially material config changes; self-approval blocked.CR-CFG-008
☐Idempotency keys on all value-mutating operations.HLD ADR-03
☐Signature verification & single-use nonce enforced before value-mutating redemptions; partner responses verified.CR-SEC-009 · CR-DBS-013
☐Transactional outbox + event bus wired; events documented.ARCH §Events
☐Immutable audit log emitted for config & financial events.CR-SEC-009
☐Tokenised identifiers; PII masked in logs/exports; data residency honoured.CR-SEC-009
☐Observability: logs/metrics/traces, health, SLO dashboards & alerts.ARCH §Observability
☐Performance targets validated (throughput, P95 latency) under prod-like load.NFR-01..03
☐CI/CD gates: SAST, image scan, contract & migration validation, smoke tests.CR-APP-007
☐DR: backups, replica, failover runbook tested (RPO ≤15m / RTO ≤2h).ARCH §HA/DR

Module Sign-off Matrix